|
The first sample Project Timeline covers a Web Conversion & Database Upgrade for a sophisticated script driven diagnostic system. The systems is currently in use and is fully developed as a prototyped "proof of concept" system. This project included a basic architecture document which consisted of approximately 10 Powerpoint slides outlining the system design. Text described the technical points, which was edit to insure a consistent underlying support for our technical strategy. Click
here for the Project Timeline consisting of approximately 100 line items divided into roughly 5 categories.
Click
here to view the sample Project Timeline for the development and interface technologies for implementing the XML parser and Vendor "Legacy System" client interface application. This sample includes a VB Application that displays metadata (text) and extracts any .EXE’s. An Operator presses “Accept” or “Reject”; Accept Sends text to an external mechanical system, and provides a hard copy option. EXE’s are sent to a staging server. An email is sent to an external mechanical system operator. The Project Timeline consisting of approximately 70 line items divided into 7 categories.
|